What substrate preparation and curing conditions are required for Polycoat cold applied bitumen emulsion systems?

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #1228
    Raymond
    Participant

    What substrate preparation and curing conditions are required for Polycoat cold applied bitumen emulsion systems?

    #1229
    Nathan
    Participant

    Cold applied waterproofing emulsions need a sound, clean, and dry to damp substrate with no standing water. Loose dust, laitance, curing compounds, oil, and weak concrete must be removed, and cracks or honeycombs should be repaired before coating. Priming or diluted first coat is often required to improve wetting and adhesion. Curing depends on evaporation and coalescence, so temperature, airflow, and humidity control are critical. Low temperature or high humidity slows cure, increases re emulsification risk, and reduces early rain resistance.

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.