The peel and stick performance of modified bitumen is influenced by several key process parameters. These include the temperature during application, which affects adhesion; the surface preparation of the substrate, ensuring it is clean and dry; the type and concentration of modifiers used, which enhance flexibility and adhesion; and the curing time, allowing for optimal bonding. Additionally, environmental conditions such as humidity and ambient temperature can also impact the effectiveness of the peel and stick application.